Mobile
Log In Sign Up
Home > english-chinese > "turbine power plant" in Chinese

Chinese translation for "turbine power plant"

涡轮动力装置

Related Translations:
turbine circulation:  涡轮循环
turbine case:  水轮机罩涡轮机壳涡轮机匣
sprinkler turbine:  喷灌管路
turbine stage:  透平级涡轮机级涡轮级
free turbine:  自由透平自由涡轮
turbine boost:  涡轮加速
micro turbine:  小型向心透平
turbine pig:  涡轮式清管器
split turbine:  分轴式透平
cooling turbine:  涡轮冷却器
Example Sentences:
1.Codag combined diesel engines and gas turbine power plant
柴油机和燃气轮机联合动力装置
2.Application of mechanical draft cooling towers on a gas turbine power plant
机力通风冷却塔在某燃机热电厂的应用
3.Current ge energy activities in china include gas turbine power plant construction , hydro , oil and gas and renewable energy projects as well as preparing for the 2008 beijing olympics
目前ge能源集团在中国的业务包括燃气轮机发电厂建设水力石油天然气和可再生能源项目,并积极参与2008年北京奥运会筹备工作。
4.Key siemens projects in zhejiang includes ultra supercritical steam turbine power plant in yuhuan , container capacity upgrade for beilun container terminal phase iv of ningbo port , advanced imaging system for zhejiang people ' s hospital and turn - key project for the hangzhou qige waste water plant , to just name a few
西门子在浙江的主要项目包括:玉环电厂超超临界汽轮机组,宁波港北仑四期集装箱码头集装箱容量升级,浙江省人民医院先进的影像系统以及杭州市七格污水处理厂的整体承包工程等。
5.This article demonstrates the changing trends and reasons of the fuel oil prices in international and domestic markets , makes an in - depth analysis on how the changes of the fuel oil prices impact on the gas turbine power plants , and provides policy and operational recommendations on the development and way out for the gas turbine power plants
本文阐述了国际国内燃料油价格变化趋势及原因,深入分析燃料油价格变化对燃机电力企业的影响,并对燃机电力企业的发展和出路提供政策和经营建议。
6.This essay , which researches into huaneng chongqing gas turbine power plant ( 108 . 25mw ) as its object of study , carries out calculations on the variable rated performance of the steam - gas turbine combined operation , utilizing an integrated method of theoretic analytics and artificial neural net . a set of software system applicable to monitoring of plant performance has been developed based on the calculations , which is used to raise the efficiency of a combined cycle plant to achieve largest possible economic profit
本文以华能重庆燃机电厂( 108 . 25mw )为研究对象,应用理论分析和人工神经网络相结合方法,对蒸汽- -燃气轮机联合循环进行变工况性能计算,并以此为基础开发出一套适用于工况监测的软件系统,以提高联合循环电站的营运水平,获取最大经济效益。
Similar Words:
"turbine plant" Chinese translation, "turbine plenum drain" Chinese translation, "turbine power" Chinese translation, "turbine power control valve" Chinese translation, "turbine power output" Chinese translation, "turbine powered catapult" Chinese translation, "turbine pressure ratio" Chinese translation, "turbine propeller" Chinese translation, "turbine propeller airplane" Chinese translation, "turbine propeller combination" Chinese translation